Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Design and construction of masonry and earth fill dam across White Nile, 26 mi above Khartoum, Sudan, having total length of 16,404 ft of which 5554 ft is masonry structure about 60 ft max height, comprising sluice dam 1489 ft long; details of solid dam, sluice dam; training walls and aprons; lock guide walls and fish ladder; embankment dam; steelwork and mechanical equipment; operation of reservoir; cost about 2,000,000 Egyptian pounds. (See also - n 543 Aug 1941 p 240-4; Instn Civ Engrs -- J v 16 n 7 and 8 June 1941 p 326-50 and (discussion) Oct p 594-7)
Design and construction of masonry and earth fill dam across White Nile, 26 mi above Khartoum, Sudan, having total length of 16,404 ft of which 5554 ft is masonry structure about 60 ft max height, comprising sluice dam 1489 ft long; details of solid dam, sluice dam; training walls and aprons; lock guide walls and fish ladder; embankment dam; steelwork and mechanical equipment; operation of reservoir; cost about 2,000,000 Egyptian pounds. (See also - n 543 Aug 1941 p 240-4; Instn Civ Engrs -- J v 16 n 7 and 8 June 1941 p 326-50 and (discussion) Oct p 594-7)
Gebal Aulia dam
Water Water Eng
Vaughan-Lee, A.G. (Autor:in)
1941
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1937
TURBINES - Enter the matrix - Hydromatrix power modules are go at the Jebel Aulia project
Online Contents | 2004