Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Rubber tired haulage with bad roof conditions at New Paradise mine
Description of operations at mine of Crescent Coal Co, in Muhlenberg County, Ky; mine was opened by slope 7 ft high and 16 ft wide, driven on 18° pitch; driving and timbering slope; bad roof required heavy timbering; development layout; face operations; rubber tired shuttle cars; safety; surface plant.
Rubber tired haulage with bad roof conditions at New Paradise mine
Description of operations at mine of Crescent Coal Co, in Muhlenberg County, Ky; mine was opened by slope 7 ft high and 16 ft wide, driven on 18° pitch; driving and timbering slope; bad roof required heavy timbering; development layout; face operations; rubber tired shuttle cars; safety; surface plant.
Rubber tired haulage with bad roof conditions at New Paradise mine
Min Congress J
Padgett, W. (Autor:in)
1941
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Haulage by rubber-tired vehicles in pit and quarry industry
Engineering Index Backfile | 1967
|Stabilization of strip mine haulage roads
Engineering Index Backfile | 1959
|Low-height electric mine-haulage locomotive
Engineering Index Backfile | 1941