Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Methods of bridge replacement on C.N.R. near Aurora, Ont.
Renewal of grade separation bridge on Newmarket subdivision of Canadian National Railways near Aurora, Ont, demonstrating suitability of steel H-piles, driven to refusal, as means of overcoming unstable foundation conditions and effectiveness of carefully planned erection methods.
Methods of bridge replacement on C.N.R. near Aurora, Ont.
Renewal of grade separation bridge on Newmarket subdivision of Canadian National Railways near Aurora, Ont, demonstrating suitability of steel H-piles, driven to refusal, as means of overcoming unstable foundation conditions and effectiveness of carefully planned erection methods.
Methods of bridge replacement on C.N.R. near Aurora, Ont.
Roads Bridges
Roads and Bridges ; 78
1940
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
New C.N.R. bridge at Fredericton
Engineering Index Backfile | 1939
Engineering Index Backfile | 1928
|C.N.R. Uses 175-ft. Steel piles to bridge Kinojevis River
Engineering Index Backfile | 1939
|Bridge piers of structural steel piles meet with favor on C.N.R.
Engineering Index Backfile | 1940
Engineering Index Backfile | 1946