Methods employed by Kumardhubi Engineering Works in reconstructing Barakar bridge, carrying Grand Trunk Road between Calcutta and Benares across Barakar River; scheme selected required that each of 27 existing main girders should be replaced by new girders of greater load capacity; existing deck was to be maintained; new girders to be on same centers as old main girders; bridge to be available for light traffic during reconstruction. Before Junior Instn Engrs.
Methods employed by Kumardhubi Engineering Works in reconstructing Barakar bridge, carrying Grand Trunk Road between Calcutta and Benares across Barakar River; scheme selected required that each of 27 existing main girders should be replaced by new girders of greater load capacity; existing deck was to be maintained; new girders to be on same centers as old main girders; bridge to be available for light traffic during reconstruction. Before Junior Instn Engrs.
Barakar bridge reconstruction
Civ Eng (Lond)
Squire, R.H. (Autor:in)
1941
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Successive failure of two high level bridges over Barakar in 250th mile of Grand Trunk Road