Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Dry and burn 70 M brick in 40 hours with industry's strangest tunnel kiln
Labor of only two men is needed to run each tunnel kiln at Streator Brick Co, where all operations are done from beneath tunnels; automatic transfer car does work of several men.
Dry and burn 70 M brick in 40 hours with industry's strangest tunnel kiln
Labor of only two men is needed to run each tunnel kiln at Streator Brick Co, where all operations are done from beneath tunnels; automatic transfer car does work of several men.
Dry and burn 70 M brick in 40 hours with industry's strangest tunnel kiln
Brick Clay Rec
1941
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Burn brick in direct fired tunnel kiln
Engineering Index Backfile | 1924
Firing fire brick in circular tunnel kiln
Engineering Index Backfile | 1937
Engineering Index Backfile | 1956
|Burning fire brick and shapes in circular tunnel kiln
Engineering Index Backfile | 1935
Temperature field analysis of tunnel kiln for brick production
British Library Online Contents | 2006
|