Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Special construction at Quonset
Report on construction of $25,000,000 naval air station in winter weather that complicated operations during first 5 mo; road and railroad on peat ground; runway built on frozen subgrade; concrete incasement of tops of steel H-piles for aircraft carrier pier; use of vacuum mats on concrete; paving of concrete aprons; handling of salamanders; tarpaulin inclosures permitting barracks construction to proceed through winter. (See also - correction July 17 p 79)
Special construction at Quonset
Report on construction of $25,000,000 naval air station in winter weather that complicated operations during first 5 mo; road and railroad on peat ground; runway built on frozen subgrade; concrete incasement of tops of steel H-piles for aircraft carrier pier; use of vacuum mats on concrete; paving of concrete aprons; handling of salamanders; tarpaulin inclosures permitting barracks construction to proceed through winter. (See also - correction July 17 p 79)
Special construction at Quonset
Eng News-Rec
Engineering News-Record ; 126
1941
6 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Record time construction at Quonset Naval Air Station
Engineering Index Backfile | 1942
|Quonset huts for California camp
Engineering Index Backfile | 1944