Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of new sewer system for the city of Buenos Aires
Design and construction of new sewer main, including cast-iron pipe line, 3 m. in diameter, 13,760 m. long, also reinforced-concrete tunnel section, about 1300 m. long, of which 916 m. was built under water, of precast reinforced-concrete section 15 m. long; methods of launching and towing of concrete sections.
Construction of new sewer system for the city of Buenos Aires
Design and construction of new sewer main, including cast-iron pipe line, 3 m. in diameter, 13,760 m. long, also reinforced-concrete tunnel section, about 1300 m. long, of which 916 m. was built under water, of precast reinforced-concrete section 15 m. long; methods of launching and towing of concrete sections.
Construction of new sewer system for the city of Buenos Aires
Bau der neuen abwaesseranlage der stadt Buenos Aires
Laucher, K. (Autor:in)
Bauingenieur ; 11
1930
6 pages
13 Figs.
Aufsatz (Zeitschrift)
Deutsch
© Metadata Copyright Elsevier B. V. All rights reserved.
Third main sewer of city of Buenos Aires and vicinity
Engineering Index Backfile | 1945
|Engineering Index Backfile | 1942
|Buenos Aires - city of extremes
British Library Online Contents | 1999
|Siphon under Riachuelo creek for crossing of third main sewer of city of Buenos Aires
Engineering Index Backfile | 1943
|