Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Status of Neckar River canalization
Design and construction of canalized section of Neckar River between Plochingen, near Stuttgart, and Mannheim on Rhine, extending over distance of 210 km.; organization and financing; notable structures such as canal locks, movable weirs, bridges, etc.; hydroelectric power development at Horkheim, having ultimate capacity of 26,300,000 kw-hr.; architectural treatment of structures.
Status of Neckar River canalization
Design and construction of canalized section of Neckar River between Plochingen, near Stuttgart, and Mannheim on Rhine, extending over distance of 210 km.; organization and financing; notable structures such as canal locks, movable weirs, bridges, etc.; hydroelectric power development at Horkheim, having ultimate capacity of 26,300,000 kw-hr.; architectural treatment of structures.
Status of Neckar River canalization
Der Stand der Neckarkanalisierung
Jurisch (Autor:in) / Burkhardt, E. (Autor:in) / Scheible, M. (Autor:in)
1930
28 pages
50 Figs., partly on supp. plates
Aufsatz (Zeitschrift)
Deutsch
© Metadata Copyright Elsevier B. V. All rights reserved.
The canalization of the neckar between Mannheim and Heilbronn
Engineering Index Backfile | 1911
Engineering Index Backfile | 1908
|Full canalization of Illinois River
Engineering Index Backfile | 1934
|Canalization of lower main river
Engineering Index Backfile | 1930
|10 yr of Meuse River canalization
Engineering Index Backfile | 1940
|