Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Design and construction of concrete dam of gravity type, curved in alignment, partly Ogee and partly non-overflow, rising 28.3 m. above stream bed, 420 m. long; stream-flow data and groundwater conditions. Water cushions, 32 m. long and 3 m. deep; hydraulics of outlet works; power generating equipment; layout of construction camp; testing of concrete and other materials used in construction. (See also - nos. 11 Mar. 14, 1930, pp. 149-153, no 15 Apr. 4, pp. 233-237)
Design and construction of concrete dam of gravity type, curved in alignment, partly Ogee and partly non-overflow, rising 28.3 m. above stream bed, 420 m. long; stream-flow data and groundwater conditions. Water cushions, 32 m. long and 3 m. deep; hydraulics of outlet works; power generating equipment; layout of construction camp; testing of concrete and other materials used in construction. (See also - nos. 11 Mar. 14, 1930, pp. 149-153, no 15 Apr. 4, pp. 233-237)
Kriebstein dam and hydroelectric plant at Waldheim in the Valley of the Zschopau
Das Talsperrenkraftwerk Kriebstein bei Waldheim im Tale der Zschopau
Kirsten (Autor:in)
Bautechnik ; 8
1930
4 pages
38 Figs.
Aufsatz (Zeitschrift)
Deutsch
© Metadata Copyright Elsevier B. V. All rights reserved.