Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Formwork, placing of reinforcements, concreting and removing of forms for church construction were carried out within 9 weeks; six concrete frames, spaced 5 m. apart, support structures; inner ceiling is made of wood in order to improve acoustics.
Formwork, placing of reinforcements, concreting and removing of forms for church construction were carried out within 9 weeks; six concrete frames, spaced 5 m. apart, support structures; inner ceiling is made of wood in order to improve acoustics.
Concrete church in stettin, Germany
Die Betonkirche der Jakobi-Gemeinde in Stettin
Dahl, K. (Autor:in)
Zement ; 19
1930
2 pages
3 Figs.
Aufsatz (Zeitschrift)
Deutsch
© Metadata Copyright Elsevier B. V. All rights reserved.
TIBKAT | 1927
|