Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of the new Nadrai (Kali Nadi) Aqueduct, Ganges Canal
Construction of the new Nadrai (Kali Nadi) Aqueduct, Ganges Canal. Consists of 15 arches of 60 ft. span. Well-foundations with concrete filling. Folding plate of illustrations.
Construction of the new Nadrai (Kali Nadi) Aqueduct, Ganges Canal
Construction of the new Nadrai (Kali Nadi) Aqueduct, Ganges Canal. Consists of 15 arches of 60 ft. span. Well-foundations with concrete filling. Folding plate of illustrations.
Construction of the new Nadrai (Kali Nadi) Aqueduct, Ganges Canal
Proc Inst CE
Good, William (Autor:in)
Proceedings of the Institution of Civil Engineers ; 1891
1891
14 pages
Illustrations
Aufsatz (Konferenz)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1892
Engineering Index Backfile | 1894
Engineering Index Backfile | 1898
|The Basingstoke Canal Aqueduct
British Library Online Contents | 1998
|