Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Reconstruction of Kidwelly viaduct
Viaduct reconstructed by Great Western Railway; structure carries up and down South Wales main lines over River Gwendraeth Fach; viaduct consists of four spans, each of 68 ft, giving total length of 272 ft; substructure is made up of two stone abutments and three piers sunk in river bed; each of piers comprises three concrete filled wrought iron cylinders 6 ft diam, set 15 ft 1 1/2 in. apart, and braced transversely at top with wrought iron girders to act as one unit.
Reconstruction of Kidwelly viaduct
Viaduct reconstructed by Great Western Railway; structure carries up and down South Wales main lines over River Gwendraeth Fach; viaduct consists of four spans, each of 68 ft, giving total length of 272 ft; substructure is made up of two stone abutments and three piers sunk in river bed; each of piers comprises three concrete filled wrought iron cylinders 6 ft diam, set 15 ft 1 1/2 in. apart, and braced transversely at top with wrought iron girders to act as one unit.
Reconstruction of Kidwelly viaduct
Ry Gaz
1940
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Reconstruction of Longeray viaduct
Engineering Index Backfile | 1946
|Reconstruction of Longeray viaduct
Engineering Index Backfile | 1946
|Reconstruction of Grandfey viaduct
Engineering Index Backfile | 1925
Reconstruction of Paudeze viaduct
Engineering Index Backfile | 1925
|Reconstruction of Boyne viaduct, Drogheda
Engineering Index Backfile | 1934
|