Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Reconstruction of approach spans Grafton bridge
Report on reconstruction of Vierendeel truss approaches of bridge at Auckland, New Zealand, at cost of about £22,000; stress conditions in existing girders; design of timber falsework. (See also - discussion p 54-72)
Reconstruction of approach spans Grafton bridge
Report on reconstruction of Vierendeel truss approaches of bridge at Auckland, New Zealand, at cost of about £22,000; stress conditions in existing girders; design of timber falsework. (See also - discussion p 54-72)
Reconstruction of approach spans Grafton bridge
New Zealand Instn Engrs -- Proc
Dickson, A.J. (Autor:in)
1940
23 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Reconstruction of approach spans, Royal Albert bridge, Saltash
Engineering Index Backfile | 1930
|Reconstruction of approach spans, Royal Albert Bridge, Saltash
Engineering Index Backfile | 1931
|Grafton bridge Auckland: history and upgrading
British Library Conference Proceedings | 2001
|Handling complete bridge spans
Engineering Index Backfile | 1909
Merchants Bridge spans history
British Library Online Contents | 1995
|