Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of concrete arch bridge over Meuse River, at Andenne, Belgium, consisting of three spans 40.25 m to 41.50 m long, rise 5.3 m to 5.7 m; architectural treatment of bridge; results of tests. (see also English abstract in Civ Eng (Lond) v 35 n 404 Feb 1940)
Construction of concrete arch bridge over Meuse River, at Andenne, Belgium, consisting of three spans 40.25 m to 41.50 m long, rise 5.3 m to 5.7 m; architectural treatment of bridge; results of tests. (see also English abstract in Civ Eng (Lond) v 35 n 404 Feb 1940)
La reconstruction du Pont d'Andenne sur la Meuse
La reconstruction du Pont d'Andenne sur la Meuse
1940
7 pages
Aufsatz (Zeitschrift)
Französisch
© Metadata Copyright Elsevier B. V. All rights reserved.
La reconstruction du Pont d'Andenne sur la Meuse
Engineering Index Backfile | 1940
|Le nouveau pont sur la Meuse a Ougree
Engineering Index Backfile | 1940
|DESCRIPTION D'OUVRAGE - Nouveau pont sur la Meuse à Chooz. Études d'exécution
Online Contents | 2005
|Le nouveau pont de Longdoz sur la derivation de la Meuse a Lieg
Engineering Index Backfile | 1939
|Le nouveau pont de Longdoz sur la derivation de la Meuse a Lieg
Engineering Index Backfile | 1940
|