Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Compressed air methods control sinking of four cylinder caissons
Methods and equipment used in construction of $2,100,000 substructure of Potomac River bridge at Ludlow Ferry, Md, to float four-legged caissons of massive dimensions from submerged fabricating platform, 2 mi upstream, and to lower then accurately to position over clusters of steel foundation piles at depths up to 72 ft below mean low water; adaptation of diving bell to large multiple cylinder caissons.
Compressed air methods control sinking of four cylinder caissons
Methods and equipment used in construction of $2,100,000 substructure of Potomac River bridge at Ludlow Ferry, Md, to float four-legged caissons of massive dimensions from submerged fabricating platform, 2 mi upstream, and to lower then accurately to position over clusters of steel foundation piles at depths up to 72 ft below mean low water; adaptation of diving bell to large multiple cylinder caissons.
Compressed air methods control sinking of four cylinder caissons
Construction Methods
1940
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Sinking monoliths and caissons in compressed air
Engineering Index Backfile | 1937
|Caissons solve sinking problem
Engineering Index Backfile | 1952
|Caissons solve sinking problem
Engineering Index Backfile | 1952
|Sinking pier caissons for four Missouri river bridges
Engineering Index Backfile | 1924
|Precision devices for sinking tunnel caissons
Engineering Index Backfile | 1940
|