Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The Tansa completion works for the water-supply of Bombay
Main sections of work involve construction of about 48 miles of pipe track from Tansa to Bandra and 3 1/4 miles of track for 60-in. branch main from Powai to Ghatkoper; building of steel bridges across Bassein and Bandra creeks; supply, manufacture, transport, and laying of 81 miles of 72-in. steel pipes from Tansa to Powai; remodelling of distribution system in Bombay; raising of Tansa dam; construction of filter beds for water from Tansa Lake; arrangements for chlorination of Tansa water supply; construction of service reservoir at Sion hill and enlargement of Bhandarwada reservoir, etc.
The Tansa completion works for the water-supply of Bombay
Main sections of work involve construction of about 48 miles of pipe track from Tansa to Bandra and 3 1/4 miles of track for 60-in. branch main from Powai to Ghatkoper; building of steel bridges across Bassein and Bandra creeks; supply, manufacture, transport, and laying of 81 miles of 72-in. steel pipes from Tansa to Powai; remodelling of distribution system in Bombay; raising of Tansa dam; construction of filter beds for water from Tansa Lake; arrangements for chlorination of Tansa water supply; construction of service reservoir at Sion hill and enlargement of Bhandarwada reservoir, etc.
The Tansa completion works for the water-supply of Bombay
Instn Civ Engrs -- Proc
Stonebridge, A.W. (Autor:in)
1927
30 pages
12 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1892
Engineering Index Backfile | 1926
Engineering Index Backfile | 1916
Engineering Index Backfile | 1952
Engineering Index Backfile | 1953