Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
200000 yards of concrete placed for $800000 in lake Washington canal lock, economical mixing and handling of concrete at Seattle
200000 Yards of Concrete Placed for $800000 in Lake Washington Canal Lock, Economical mixing and handling of concrete at Seattle. (2500 w.) (No. 63021)
200000 yards of concrete placed for $800000 in lake Washington canal lock, economical mixing and handling of concrete at Seattle
200000 Yards of Concrete Placed for $800000 in Lake Washington Canal Lock, Economical mixing and handling of concrete at Seattle. (2500 w.) (No. 63021)
200000 yards of concrete placed for $800000 in lake Washington canal lock, economical mixing and handling of concrete at Seattle
Eng Rec
1915
Ills.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Lock concrete placed by pumping
Engineering Index Backfile | 1934
Engineering Index Backfile | 1900
|Exercise Yards for Cattle. Concrete Constructions are Economical and Durable
British Library Conference Proceedings | 1997
|Lake union bridge, Seattle, Washington
Engineering Index Backfile | 1930
DataCite | 1909