Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Grouting foundations for gravity-section dam
Holes 40 ft. deep and 10 ft. apart were drilled and grouted in soft shale overlying sandstone quartzite. (1200 w.) (No. 57142)
Grouting foundations for gravity-section dam
Holes 40 ft. deep and 10 ft. apart were drilled and grouted in soft shale overlying sandstone quartzite. (1200 w.) (No. 57142)
Grouting foundations for gravity-section dam
Eng Rec
Johnston, Harold S. (Autor:in)
1914
Ills.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Grouting Technologies for Dam Foundations
British Library Conference Proceedings | 1998
|Grouting foundations of Boulder Dam
Engineering Index Backfile | 1936
|Technique of pressure grouting of foundations
Engineering Index Backfile | 1928
|Grouting and drainage of dam foundations
Engineering Index Backfile | 1968
|Modern practice in grouting dam foundations
Engineering Index Backfile | 1951
|