Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The problem of setting "slope stakes"from which may be determined the amount of earthwork in cut or fill. Drawings. (2500 w.) (No. 56838)
The problem of setting "slope stakes"from which may be determined the amount of earthwork in cut or fill. Drawings. (2500 w.) (No. 56838)
Cross-sectioning
Can Engr
Macdonald, J.A. (Autor:in)
1914
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 2006
|Simplified method of railway cross-sectioning
Engineering Index Backfile | 1932
|A rapid and accurate method of cross-sectioning tunnels
Engineering Index Backfile | 1916
|Light Sectioning of Underground Excavations
Online Contents | 1995
|Light Sectioning of Underground Excavations
British Library Conference Proceedings | 1994
|