Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
History of Athens water supply since ancient times and description of recently completed new water-supply system, including marble-faced Marathon Dam, 177 ft high, and Boyiati Tunnel, 8.4 mi long, 7.5 ft wide by 8.1 ft high; large quantities of water under pressure were encountered; new distribution system; purification plant; cost of works $11,300,000.
History of Athens water supply since ancient times and description of recently completed new water-supply system, including marble-faced Marathon Dam, 177 ft high, and Boyiati Tunnel, 8.4 mi long, 7.5 ft wide by 8.1 ft high; large quantities of water under pressure were encountered; new distribution system; purification plant; cost of works $11,300,000.
Athens builds modern water works
Civ Eng (NY)
Gausmann, R.W. (Autor:in)
1933
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Southwestern builds modern maintenance facilities
Engineering Index Backfile | 1930
|Fort Wayne builds modern carhouse
Engineering Index Backfile | 1924
Snohomish County, Washington builds modern airport
Engineering Index Backfile | 1940
|Canadian national builds modern terminal facilities
Engineering Index Backfile | 1929
Pennsylvania builds modern steel car shops
Engineering Index Backfile | 1924