Construction features of Chats Falls development
Construction of hydroelectric power development on Ottawa River, having ultimate capacity of 280,000 hp; building of cofferdams; excavation of 300,000 cu yds of rock; method of handling resulting material; concrete plant placed about 140,000 cu yd; handling of 11, 000 tons of equipment and steel; construction of low earth dam, 4300 ft long, requiring excavation of 186,000 cu yd. (see also Contract Rec v 47 n 18 and 23 May 3 1933 p 433-7 and June 7 p 573-6)
Construction features of Chats Falls development
Construction of hydroelectric power development on Ottawa River, having ultimate capacity of 280,000 hp; building of cofferdams; excavation of 300,000 cu yds of rock; method of handling resulting material; concrete plant placed about 140,000 cu yd; handling of 11, 000 tons of equipment and steel; construction of low earth dam, 4300 ft long, requiring excavation of 186,000 cu yd. (see also Contract Rec v 47 n 18 and 23 May 3 1933 p 433-7 and June 7 p 573-6)
Construction features of Chats Falls development
Eng J
Trotter, H.L. (Autor:in) / Dick, J. (Autor:in)
Engineering Journal ; 16
1933
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction features of Chats Falls development
Engineering Index Backfile | 1933
|Power development at Chats Falls
Engineering Index Backfile | 1931
Concreting problems -- Chats Falls power development
Engineering Index Backfile | 1933
|Chats Falls-Beauharnois 220 kv. Extension
Engineering Index Backfile | 1932
Placing concrete as a monolith -- Chats falls power development
Engineering Index Backfile | 1949
|