Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
High-pressure gates for upstream plugs in tunnels nos 2 and 3, Boulder Dam
Invitation for bids, schedule, specifications and drawings of high-pressure gates for upstream plugs in tunnels nos. 2 and 3, Boulder Dam, Boulder Canyon Project; requirement is for eight 6-ft by 7-ft 6-in. high-pressure gates, together with frames, hoists, hangers, and conduit linings, bolts, etc.
High-pressure gates for upstream plugs in tunnels nos 2 and 3, Boulder Dam
Invitation for bids, schedule, specifications and drawings of high-pressure gates for upstream plugs in tunnels nos. 2 and 3, Boulder Dam, Boulder Canyon Project; requirement is for eight 6-ft by 7-ft 6-in. high-pressure gates, together with frames, hoists, hangers, and conduit linings, bolts, etc.
High-pressure gates for upstream plugs in tunnels nos 2 and 3, Boulder Dam
U S Bur Reclamation -- Specifications
1933
13 pages
10 Supp plates
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1936
|Demands on Plugs and Anchors in Tunnels
British Library Online Contents | 2003
|Steel gates for diversion tunnels
Engineering Index Backfile | 1933
|GATES AND VALVES - Intake gates: Upstream or downstream seals?
Online Contents | 2002
|50-ft. by 50-ft. bulkhead gates at Boulder dam
Engineering Index Backfile | 1937
|