Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Concrete wall replaces levee at Helena, Ark.
Old 1914 levee surmounted by concrete wall, with sheetpile cutoff down to 60-ft depth, is substituted for enlarged 1928 section levee; wall design and construction procedure; method and cost of driving steel sheet piling; cost of constructing 3161 ft of concrete flood-protection wall on Mississippi River.
Concrete wall replaces levee at Helena, Ark.
Old 1914 levee surmounted by concrete wall, with sheetpile cutoff down to 60-ft depth, is substituted for enlarged 1928 section levee; wall design and construction procedure; method and cost of driving steel sheet piling; cost of constructing 3161 ft of concrete flood-protection wall on Mississippi River.
Concrete wall replaces levee at Helena, Ark.
Eng News-Rec
Pittman, H.V. (Autor:in)
Engineering News-Record ; 110
1933
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Reconstruction of the Mississippi river levee at Helena, Ark
Engineering Index Backfile | 1914
Concrete sheetpile levee wall at New Orleans
Engineering Index Backfile | 1924
|CONSTRUCTION DEVICE OF LEVEE WATERPROOF WALL AND CONSTRUCTION METHOD OF LEVEE WATERPROOF WALL
Europäisches Patentamt | 2020
|FRP replaces heavy concrete covers
British Library Online Contents | 2009