Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Method of moving steel-truss highway bridges over Miami River near Dayton, Ohio; traffic stopped only 18 hr.
Method of moving steel-truss highway bridges over Miami River near Dayton, Ohio; traffic stopped only 18 hr.
Two three-span bridges moved in six hours
Roads Streets
Brannon, L. (Autor:in)
Roads and Streets ; 76
1933
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1944
|Engineering Index Backfile | 1944
|Engineering Index Backfile | 1945
|Old swing span moved upstream for road detour
Engineering Index Backfile | 1934
Engineering Index Backfile | 1946
|