Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Three-span continuous-truss railroad bridge, Cincinnati, Ohio
Newest bridge of Chesapeake and Ohio Railway Co, across Ohio River consisting of three spans 450 ft, 675 ft and 450 ft long; design and construction of masonry and reinforcedconcrete piers, up to 121 ft bottom width and 157.5 ft in height; expansion shoes. (see also discussion in n 8 pt 1 Oct p 1373-4)
Three-span continuous-truss railroad bridge, Cincinnati, Ohio
Newest bridge of Chesapeake and Ohio Railway Co, across Ohio River consisting of three spans 450 ft, 675 ft and 450 ft long; design and construction of masonry and reinforcedconcrete piers, up to 121 ft bottom width and 157.5 ft in height; expansion shoes. (see also discussion in n 8 pt 1 Oct p 1373-4)
Three-span continuous-truss railroad bridge, Cincinnati, Ohio
Am Soc Civ Engrs -- Proc
Ballard, W.T. (Autor:in)
1933
22 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Three-span continuous-truss railroad bridge, Cincinnati, Ohio
Engineering Index Backfile | 1934
|Long-span continuous-truss bridge over the Ohio
Engineering Index Backfile | 1915
Continuous truss bridge 1575 ft. long at Cincinnati
Engineering Index Backfile | 1929