Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Long precast bridge slabs carry tracks without ballast
Canadian National completed two single-track bridges in which track ballast is eliminated completely and rails are set directly on oak cushion strips flush with top surface of deck slab; details of joint and reinforcing; equipment. (See also Ry Age v 95 n 6 Aug 5 1933 p 209-11)
Long precast bridge slabs carry tracks without ballast
Canadian National completed two single-track bridges in which track ballast is eliminated completely and rails are set directly on oak cushion strips flush with top surface of deck slab; details of joint and reinforcing; equipment. (See also Ry Age v 95 n 6 Aug 5 1933 p 209-11)
Long precast bridge slabs carry tracks without ballast
Ry Eng Maintenance
1933
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Long precast bridge slabs carry tracks without ballast
Engineering Index Backfile | 1933
Precast concrete bridge deck slabs
Engineering Index Backfile | 1950
Precast slabs make low-cost bridge
Engineering Index Backfile | 1951
|Precast concrete slabs face bridge abutments
Engineering Index Backfile | 1940
|110-ton bridge slabs precast on shore
Engineering Index Backfile | 1945