Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Handling 2,000,000 cu yd. of excavation at Boulder Dam
Rock from canyon walls and riverbed gravel moved out by truck fleet and trains; cofferdam construction coordinated with excavating program; daily peak reaches 7200 truckloads, or 38,000 cu yd; streambed excavation.
Handling 2,000,000 cu yd. of excavation at Boulder Dam
Rock from canyon walls and riverbed gravel moved out by truck fleet and trains; cofferdam construction coordinated with excavating program; daily peak reaches 7200 truckloads, or 38,000 cu yd; streambed excavation.
Handling 2,000,000 cu yd. of excavation at Boulder Dam
Eng News-Rec
Engineering News-Record ; 110
1933
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Germany tests at 2,000,000 volts
Engineering Index Backfile | 1929
Michigan builds expressway costing $2,000,000 a mile
Engineering Index Backfile | 1944
Statistics of Boulder Encounters during Shaft Excavation
Online Contents | 2005
|Statistics of Boulder Encounters during Shaft Excavation
Online Contents | 2005
|Statistics of Boulder Encounters during Shaft Excavation
British Library Online Contents | 2006
|