Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Marina (Cork) generating station: civil engineering works
Appendix. Installed capacity of two 30,000-kw-turboalternators and three boilers, each having max continuous rating of 200,000 lb of steam per hr at 625 psig and 865 F; principal civil works comprise power station buildings, switch, office and stores buildings, cooling water system, coal and oil storage and 250 ft high reinforced concrete chimney.
Marina (Cork) generating station: civil engineering works
Appendix. Installed capacity of two 30,000-kw-turboalternators and three boilers, each having max continuous rating of 200,000 lb of steam per hr at 625 psig and 865 F; principal civil works comprise power station buildings, switch, office and stores buildings, cooling water system, coal and oil storage and 250 ft high reinforced concrete chimney.
Marina (Cork) generating station: civil engineering works
Instn Civ Engrs Ireland -- Trans
Moynihan, J.J. (Autor:in)
1956
12 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Elizabeth Marina, Jersey - modelling marina entrance improvement works
British Library Conference Proceedings | 2002
|Skogfoss hydroelectric power station, Norway/U.S.S.R. -- Civil engineering works
Engineering Index Backfile | 1965
|Special features of civil engineering works at Aberthaw power station
Engineering Index Backfile | 1962
|Civil engineering works: buildings
British Library Conference Proceedings | 1993
|