Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Contract to build $8 million major sewer system involving rugged excavation; system is 250-300 mi long, including service laterals; problems connected with groundwater, nature of soil, etc; equipment used.
Salt lake's 250-mile sewer program
Excavating Engr
Day, R. (Autor:in)
Excavating Engineer ; 50
1956
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1929
|THE HISTORY IN HARRIETT LAKE'S CLOSET
British Library Online Contents | 2009
|Building one-mile sewer by tunnelling
Engineering Index Backfile | 1946
Seventeen-mile belt-line sewer at Springfield
Engineering Index Backfile | 1927
Three-mile outfall sewer laid below harbor bottom
Engineering Index Backfile | 1929