Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Muck stabilizes loose sand base
Matanzas Inlet project consists of 17 1/3 mi of highway rebuilding, with novel revetment to protect it, and concrete bridge 1704 ft long; road is built on continuous sand dune or escarpment; loose sand stabilized with muck taken from borrow pits on inland side; pavement laid with double penetration using mineral aggregate; design of bridge; construction, jetting, and material used.
Muck stabilizes loose sand base
Matanzas Inlet project consists of 17 1/3 mi of highway rebuilding, with novel revetment to protect it, and concrete bridge 1704 ft long; road is built on continuous sand dune or escarpment; loose sand stabilized with muck taken from borrow pits on inland side; pavement laid with double penetration using mineral aggregate; design of bridge; construction, jetting, and material used.
Muck stabilizes loose sand base
Pub Works
Public Works ; 87
1956
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Threshold of Friction Stabilizes Self-Weight Transmission in Gravitating Loose Sand Heaps
British Library Conference Proceedings | 2013
|Stabilization by drainage of Muck and Sand Fill
Engineering Index Backfile | 1932
|Vertical Sand Drains for Stabilizing Muck-Peat Soils
ASCE | 2021
|Construction method of deep gravel cut-off seepage ditch under loose muck condition
Europäisches Patentamt | 2024
|Dredge strips swamp muck, backfills sand for work area
Engineering Index Backfile | 1957