Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Diversion of annalong river into silent valley reservoir
Third phase of development of Belfast Water Commissioners' Mourne Scheme by means of which 4 1/2 mgd is made available; estimate made of reliable yield of catchment area; fissure encountered in tunnel in one heading; measures taken to consolidate it by high pressure grouting described. (See also - discussion p 174-83)
Diversion of annalong river into silent valley reservoir
Third phase of development of Belfast Water Commissioners' Mourne Scheme by means of which 4 1/2 mgd is made available; estimate made of reliable yield of catchment area; fissure encountered in tunnel in one heading; measures taken to consolidate it by high pressure grouting described. (See also - discussion p 174-83)
Diversion of annalong river into silent valley reservoir
Instn Civ Engrs -- Proc
Colebrook, C.F. (Autor:in)
1956
14 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1931
Construction of silent valley reservoir. Belfast water-supply
Engineering Index Backfile | 1935
|Construction of silent valley reservoir. Belfast water-supply
Engineering Index Backfile | 1934
|Silent valley reservoir. Mourne Mountains, county of Down
Engineering Index Backfile | 1934
Construction of silent valley reservoir. Belfast water-supply
Engineering Index Backfile | 1934
|