Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Design and construction of Aden oil harbour
Layout of harbour and factors influencing design; breakwater core constructed entirely by tipping rock from Euclid wagons; special rolling of hexagonal steel piles adopted for jetties; framework of jetty was of steel sections welded together; dredging of harbour area and approach channel amounted to about 6,000,000 cu yd. (See also - discussion p 383-98; unsigned article in World Construction v 9 n 8 Aug 1956 p 38)
Design and construction of Aden oil harbour
Layout of harbour and factors influencing design; breakwater core constructed entirely by tipping rock from Euclid wagons; special rolling of hexagonal steel piles adopted for jetties; framework of jetty was of steel sections welded together; dredging of harbour area and approach channel amounted to about 6,000,000 cu yd. (See also - discussion p 383-98; unsigned article in World Construction v 9 n 8 Aug 1956 p 38)
Design and construction of Aden oil harbour
Instn Civ Engrs -- Proc
Palmer, J.E.G. (Autor:in) / Scrutton, H. (Autor:in)
1956
36 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Design and construction of Aden oil harbour
Engineering Index Backfile | 1956
|Breakwater for Service Harbour, Gulf of Aden
ASCE | 2004
|DataCite | 2017
|Rittersitz Haus Aden bei Bergkamen-Oberaden
DataCite | 2017
|