Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Bersimis-Lac Casse hydro-electric power development
Reasons for choosing site and detailed account of constructional work; hydrology, storage and power; dams and diversion; intake and power tunnel; surge tank; excavating power house cavern and tail race chamber; concrete and aggregate plant.
Bersimis-Lac Casse hydro-electric power development
Reasons for choosing site and detailed account of constructional work; hydrology, storage and power; dams and diversion; intake and power tunnel; surge tank; excavating power house cavern and tail race chamber; concrete and aggregate plant.
Bersimis-Lac Casse hydro-electric power development
Eng J
Rousseau, F. (Autor:in)
Engineering Journal ; 39
1956
14 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Hydro-Quebec is developing more than horse power at Bersimis
Engineering Index Backfile | 1955
|Engineering Index Backfile | 1955
Hydro-Quebec finishes first and pushes second Bersimis River job
Engineering Index Backfile | 1957
Closure to “Patterson and MacDonald on Bersimis Dams”
ASCE | 2021
|Special repairs to the Bersimis-1 generating tunnel walls to increase power production: a case study
Online Contents | 2001
|