Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Project involves control dam on Niagara River; two separate intakes of Johnson-Wahlman type 2 mi above Falls; two parallel concrete lined tunnels about 5 1/2 mi long and 45 ft in diam; open canal 200 ft wide and 2 1/4 mi long; forebay with headworks; 16 concrete encased steel penstocks 19 ft in diam; power house containing generating units, each consisting of turbine with rated capacity of 105,000 hp directly connected to 80,500-kva generator; pumped storage development.
Project involves control dam on Niagara River; two separate intakes of Johnson-Wahlman type 2 mi above Falls; two parallel concrete lined tunnels about 5 1/2 mi long and 45 ft in diam; open canal 200 ft wide and 2 1/4 mi long; forebay with headworks; 16 concrete encased steel penstocks 19 ft in diam; power house containing generating units, each consisting of turbine with rated capacity of 105,000 hp directly connected to 80,500-kva generator; pumped storage development.
Sir Adam Beck-Niagara G.S. No. 2
Water Power
Hearn, R.L. (Autor:in)
Water Power ; 8
1956
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Sir Adam Beck -- Niagara Generating Station No. 2
Engineering Index Backfile | 1957
|Rehabilitating Sir Adam Beck 2: Effective Use of the Niagara River
British Library Online Contents | 2000
|SPECIAL REPORT: - Rehabilitating Sir Adam Beck 2: Effective Use of the Niagara River
Online Contents | 2000
|