Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Savvy smooths erection of 427-ft cable roof
Oakland-Alameda County Coliseum arena seating 15,000 people, is enclosed by 76-ft long diagonal columns intersecting at mid-height to form 56-ft high trussed ring; columns support peripheral compression ring as well as window wall that encloses arena; roof has single layer of cables, weighted by precast concrete I-sections to stabilize it against flutter, and 260-ft diam steel-framed penthouse containing mechanical and electrical equipment; casting of compression ring, stringing of 96 prestressed cables and erection and placing of 90-ft long precast halves of I-beams on cables with new 140-ton truck-mounted Manitowoc crane, are given.
Savvy smooths erection of 427-ft cable roof
Oakland-Alameda County Coliseum arena seating 15,000 people, is enclosed by 76-ft long diagonal columns intersecting at mid-height to form 56-ft high trussed ring; columns support peripheral compression ring as well as window wall that encloses arena; roof has single layer of cables, weighted by precast concrete I-sections to stabilize it against flutter, and 260-ft diam steel-framed penthouse containing mechanical and electrical equipment; casting of compression ring, stringing of 96 prestressed cables and erection and placing of 90-ft long precast halves of I-beams on cables with new 140-ton truck-mounted Manitowoc crane, are given.
Savvy smooths erection of 427-ft cable roof
Eng News-Rec
Engineering News-Record ; 177
1966
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 1997
|Online Contents | 1997
|British Library Online Contents | 1994
|Online Contents | 1994
|