Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Under-designed road will give early test results
Test road constructed by Oklahoma Highway Dept to ascertain effects of adding short asbestos fiber to asphaltic concrete pavement is designed for early failure; entire project consists of 5.3 mi of asphaltic concrete surface on sand asphalt base; 4800 ft test section consisting of 16 different test panels 300 ft long and 24 ft wide of varying thicknesses and mix designs were constructed under supervision of Research and Development Div,; details on materials and test procedures.
Under-designed road will give early test results
Test road constructed by Oklahoma Highway Dept to ascertain effects of adding short asbestos fiber to asphaltic concrete pavement is designed for early failure; entire project consists of 5.3 mi of asphaltic concrete surface on sand asphalt base; 4800 ft test section consisting of 16 different test panels 300 ft long and 24 ft wide of varying thicknesses and mix designs were constructed under supervision of Research and Development Div,; details on materials and test procedures.
Under-designed road will give early test results
Pub Works
Hartronft, B.C. (Autor:in)
Public Works ; 96
1965
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Will ERTMS give us more capacity?
IuD Bahn | 2008
|Engineering Index Backfile | 1956
|RAY CECIL - Will they never give up?
Online Contents | 1994
New test track will aid road safety research
Engineering Index Backfile | 1960
|