Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Two dredges on single line place roadbed
Hydraulic fill handled by two dredges working in series on single distribution line is forming sub-base of section of relocated Route 72 in central Connecticut; two dredges were needed because of excessive head developed in pumping fill through 1 mi long pipe line that rises more than 50 ft before reaching its outfall; how fill is handled from bottom of Connecticut River to roadbed is outlined.
Two dredges on single line place roadbed
Hydraulic fill handled by two dredges working in series on single distribution line is forming sub-base of section of relocated Route 72 in central Connecticut; two dredges were needed because of excessive head developed in pumping fill through 1 mi long pipe line that rises more than 50 ft before reaching its outfall; how fill is handled from bottom of Connecticut River to roadbed is outlined.
Two dredges on single line place roadbed
Construction Method Equipment
1965
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1957
Engineering Index Backfile | 1916
|Engineering Index Backfile | 1912
|Engineering Index Backfile | 1900
|Engineering Index Backfile | 1905
|