Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Measured pore pressures used for control of two-stage construction of embankment
Because of soft foundation soil it was necessary to use two-stage construction for double-track railway embankment varying in height from 21 to 33 ft; effective stress methods of analysis were used and piezometers were installed in foundation soil to indicate pore pressures; pore pressures measured during first-stage loading indicated that second stage could be added to complete embankment about year after first stage.
Measured pore pressures used for control of two-stage construction of embankment
Because of soft foundation soil it was necessary to use two-stage construction for double-track railway embankment varying in height from 21 to 33 ft; effective stress methods of analysis were used and piezometers were installed in foundation soil to indicate pore pressures; pore pressures measured during first-stage loading indicated that second stage could be added to complete embankment about year after first stage.
Measured pore pressures used for control of two-stage construction of embankment
Can Geotechnical J
DeLory, F.A. (Autor:in) / Gass, A.A. (Autor:in) / Wong, W.W. (Autor:in)
1965
18 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Embankment pore pressures during construction
Engineering Index Backfile | 1966
|Embankment Pore Pressures during Construction
NTIS | 1966
|Embankment pore pressures during construction
Engineering Index Backfile | 1968
|Pore Pressures in Embankment Foundations
NTIS | 1968
|