Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
New buildings erected in 1965 are described; in view of short time period (5 mo) between racing seasons, "pre-fabrication" of new reinforced concrete grandstands on building site adjoining old grandstands was carried out simultaneously with demolition of latter; 198 m long 19 m high six-level structure with 18.7 m span cantilever roof was built in seven sections; these were placed on trolleys and rolled into position on rails at speeds ranging from 18 to 25 mph; total displacement was 209 m.
New buildings erected in 1965 are described; in view of short time period (5 mo) between racing seasons, "pre-fabrication" of new reinforced concrete grandstands on building site adjoining old grandstands was carried out simultaneously with demolition of latter; 198 m long 19 m high six-level structure with 18.7 m span cantilever roof was built in seven sections; these were placed on trolleys and rolled into position on rails at speeds ranging from 18 to 25 mph; total displacement was 209 m.
Modernization of Longchamp hippodrome
La modernisation del'hippodrome de longchamp
Blanchard, J. (Autor:in)
Genie Civil ; 143
1966
7 pages
Aufsatz (Zeitschrift)
Französisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 1978
|British Library Online Contents | 2006
Engineering Index Backfile | 1900
|New flanders hippodrome near Lille
Engineering Index Backfile | 1931
|LONGCHAMP RACECOURSE, PARIS DOMINIQUE PERRAULT ARCHITECTURE
British Library Online Contents | 2018
|