Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
New Bulak bridge at Cairo
Illustrated description of this new bridge over the Nile, with a Scherzer rolling lift opening span. (2500 w.) (No. 46249 A)
New Bulak bridge at Cairo
Illustrated description of this new bridge over the Nile, with a Scherzer rolling lift opening span. (2500 w.) (No. 46249 A)
New Bulak bridge at Cairo
Engr, Lond
1913
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
BULAK SUMUR FRAMEWORK: IMPLEMENTATION SOCIAL CAPITAL VALUES TO OPTIMISE ZISWAF POTENTION
DOAJ | 2021
|Engineering Index Backfile | 1906
I.C.R.R.'s bridge modernization at Cairo
Engineering Index Backfile | 1950
New khedive ismail bridge, Cairo, Egypt
Engineering Index Backfile | 1935
|CAIRO METRO Planning ahead in Cairo
Online Contents | 2011