Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Design of eastern approach Viaduct and Coach station, Plymouth
Half mi length of eastern approach is constructed with dual 22 ft wide roadways, each with 9 ft wide continuous waiting bay; central reservation is 10 ft wide and 14 ft footpaths are provided; roadways are in 8 in. reinforced concrete, finished with 2 in. hot rolled asphalt; bus station consists of perimeter circulatory road 36 ft wide surfaced with asphalt.
Design of eastern approach Viaduct and Coach station, Plymouth
Half mi length of eastern approach is constructed with dual 22 ft wide roadways, each with 9 ft wide continuous waiting bay; central reservation is 10 ft wide and 14 ft footpaths are provided; roadways are in 8 in. reinforced concrete, finished with 2 in. hot rolled asphalt; bus station consists of perimeter circulatory road 36 ft wide surfaced with asphalt.
Design of eastern approach Viaduct and Coach station, Plymouth
Instn Mun Engrs -- J
Jeffrey, N.M. (Autor:in)
1958
9 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1954
|Discussion on Modern Coach Station Design
British Library Conference Proceedings | 2013
|Discussion on Modern Coach Station Design
Trans Tech Publications | 2013
|Vingeanne Masonry viaduct, Eastern railway, France
Engineering Index Backfile | 1893