Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
We relocated river and shot away mountain to grade 4-lane highway
Cashmere realignment in Washington is expanded link in 4-lane highway connecting north central and eastern Washington with Seattle; Wenatchee river was to be moved south minimum of 150 ft to allow room for construction; channel was excavated along southern bank, and all material shoved northward; this formed dike, crowding river against north bank and allowing dry excavation of remaining material.
We relocated river and shot away mountain to grade 4-lane highway
Cashmere realignment in Washington is expanded link in 4-lane highway connecting north central and eastern Washington with Seattle; Wenatchee river was to be moved south minimum of 150 ft to allow room for construction; channel was excavated along southern bank, and all material shoved northward; this formed dike, crowding river against north bank and allowing dry excavation of remaining material.
We relocated river and shot away mountain to grade 4-lane highway
Roads Streets
Thompson, P. (Autor:in)
Roads and Streets ; 100
1957
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Relocated Huntsville highway at pine view reservoir, Ogden river project, Utah
Engineering Index Backfile | 1934
Electric power to dredge a relocated river channel
Engineering Index Backfile | 1916
|Highway through city relocated in new 200-ft right-of-way
Engineering Index Backfile | 1935
Six-lane highway bridge over Welland river
Engineering Index Backfile | 1940
|Diversion of twice relocated Emscher River in mine subsidence zone
Engineering Index Backfile | 1952
|