Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Middlefield, Calif, reservoir, 7,500,000 gal structure is designed to resist earthquake stresses; lining consists of bottom impervious layer of asphalt-stabilized native material 8 in. thick, middle layer of newly designed porous asphaltic concrete and top layer of prefabricated flexible asphalt panels; roof structure is precast concrete columns, laminated timber girders, and 3/8 in. thick plywood.
Middlefield, Calif, reservoir, 7,500,000 gal structure is designed to resist earthquake stresses; lining consists of bottom impervious layer of asphalt-stabilized native material 8 in. thick, middle layer of newly designed porous asphaltic concrete and top layer of prefabricated flexible asphalt panels; roof structure is precast concrete columns, laminated timber girders, and 3/8 in. thick plywood.
New ideas lower reservoir costs
Western Construction
Gilbert, J.B. (Autor:in)
Western Construction ; 33
1958
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Eastern reservoir designers borrow western lining ideas
Engineering Index Backfile | 1964
Eastern reservoir designers borrow western lining ideas
TIBKAT | 1965
Crossrail news - Ideas for saving costs on the project
Online Contents | 2012
Hobas pipes lower installation costs
British Library Online Contents | 2006
How to lower prestressing costs
Engineering Index Backfile | 1952
|