Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
How contractor placed 108-ton terminal track sections
Job was carried out where twin roadways of Congress Street Expressway run beneath elevated trackage of Chicago's La Salle Depot; construction of two 60-ft parallel roadway openings through busy railroad station, and replacing sections of 11 elevated tracks, without disrupting traffic is described; structural work included two concrete side walls and median wall running through 210-ft wide station.
How contractor placed 108-ton terminal track sections
Job was carried out where twin roadways of Congress Street Expressway run beneath elevated trackage of Chicago's La Salle Depot; construction of two 60-ft parallel roadway openings through busy railroad station, and replacing sections of 11 elevated tracks, without disrupting traffic is described; structural work included two concrete side walls and median wall running through 210-ft wide station.
How contractor placed 108-ton terminal track sections
World Construction
World Construction ; 10
1957
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Track maintenance contractor introduces innovations
British Library Online Contents | 1999
How contractor placed wire-mesh in concrete pavement -- By machine
Engineering Index Backfile | 1960
|PLEASE SPECIFY: CM asks an architect and a contractor who is best placed to specify materials
British Library Online Contents | 2006
PERFECT BUSINESS SUITORS Contractor accommodates working community with fast-track paving
British Library Online Contents | 2004