Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
J. R. Gillis gives method of estimating the work from profile when lack of time prevents more accurate methods. (See also Van Nos. Eng. Mag., Vol. II., p. 532)
J. R. Gillis gives method of estimating the work from profile when lack of time prevents more accurate methods. (See also Van Nos. Eng. Mag., Vol. II., p. 532)
Estimating earthwork
Trans ASCE
Gillis, J.R. (Autor:in)
1869
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Estimating Costs of Earthwork via Simulation
ASCE | 2021
|Optimizing Earthwork Estimating for Highway Construction
NTIS | 1984
|Automated Data Collection for Earthwork Estimating
British Library Conference Proceedings | 1998
|