Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Fife cantilever pier of the Forth Bridge
A two-page plate of the Fife cantilever pier of the Forth bridge, showing all of the main tubes and connections, including junction girders completed to the full height of 362 feet, the north cantilever carried out 170 feet, the first struts and braces to a height of 240 feet, and 130 feet of the viaduct completed. (A small view of the same in Lon. Eng., Jan. 27, 1888, also Eng. News, March 10, 1888.)
Fife cantilever pier of the Forth Bridge
A two-page plate of the Fife cantilever pier of the Forth bridge, showing all of the main tubes and connections, including junction girders completed to the full height of 362 feet, the north cantilever carried out 170 feet, the first struts and braces to a height of 240 feet, and 130 feet of the viaduct completed. (A small view of the same in Lon. Eng., Jan. 27, 1888, also Eng. News, March 10, 1888.)
Fife cantilever pier of the Forth Bridge
Lon Engineer
1888
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Fife cantilever pier of the Forth Bridge
Engineering Index Backfile | 1888
Engineering Index Backfile | 1890
|Engineering Index Backfile | 1891
|Pier Fixity Speeds Cantilever Construction of Roosevelt Bridge
British Library Conference Proceedings | 1996
|Observations on the Forth cantilever bridge
Engineering Index Backfile | 1890