Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Bottom heading driving on C.P.R. Tunnel in Quebec
Construction of single track, Wolfe's Cove tunnel, 1 mi long, by Canadian Pacific Railway at Quebec; combination of full-width bottom-heading driving, scraper mucking and placing concrete lining along with excavation work permitted completion of job in 11 months.
Bottom heading driving on C.P.R. Tunnel in Quebec
Construction of single track, Wolfe's Cove tunnel, 1 mi long, by Canadian Pacific Railway at Quebec; combination of full-width bottom-heading driving, scraper mucking and placing concrete lining along with excavation work permitted completion of job in 11 months.
Bottom heading driving on C.P.R. Tunnel in Quebec
Eng News-Rec
F Russell, T. (Autor:in)
Engineering News-Record ; 108
1932
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Salter Street viaduct over C.P.R. tracks at Winnipeg
Engineering Index Backfile | 1933
|British Library Online Contents | 1998
|Uznaberg Tunnel: Low-Vibration Heading
British Library Online Contents | 2000
Driving large underground heading
Engineering Index Backfile | 1963
|Vereina Tunnel South high-performance Blast Heading
British Library Online Contents | 1997
|