Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Thousand well points on 2,000 feet of subway
Construction of 1930 ft of subway on Essex St. New York, involving solution of many difficult problems; method of timbering; knee bracing of 4 × 8's to take up vibration of decking; built-up box piles; well-point installations just inside sheeting lines; handling final excavation with portable belt conveyor; substitutes for underpinning; delivery of materials for concrete. (see also Gen Contractors Assn -- Bul v 23 n 9 Sept 1932 p 192-6)
Thousand well points on 2,000 feet of subway
Construction of 1930 ft of subway on Essex St. New York, involving solution of many difficult problems; method of timbering; knee bracing of 4 × 8's to take up vibration of decking; built-up box piles; well-point installations just inside sheeting lines; handling final excavation with portable belt conveyor; substitutes for underpinning; delivery of materials for concrete. (see also Gen Contractors Assn -- Bul v 23 n 9 Sept 1932 p 192-6)
Thousand well points on 2,000 feet of subway
Contractors Engrs Monthly
1932
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Thousand well points on 2,000 feet of subway
Engineering Index Backfile | 1932
Plumbing one thousand feet skyward
Engineering Index Backfile | 1931
BETWEEN 1,501 AND 2,000 SQUARE FEET - Unique plans for mid-sized homes
Online Contents | 2004
Plan view - Great plans that meet in the middle at 1,600 to 2,000 square feet
Online Contents | 2012
Wiley | 2015
|