Mar 31 n 13 p 471-473: Uniform system in handling contract documents developed in 30 years of experience in subway construction; contract sections; contract documents; preparation; unit-price contracts; general contract provisions; comparison of stresses allowed by New York Building Code and those used in subway design by Board of Transportation; specifications. Apr 14 n 15 p 546-549: Underpinning of B.M.T. Centre St. loop at Delancey St. to permit passage of new Houston-Essex St. line underneath; pipe piles aggregating 5 mi were jacked down in order to support existing structure and to serve as foundations for new line; runner beams placed below B.M.T. invert; transverse beams placed later as part of new subway roof steel; drifting for excavation of gallery beneath subway invert. May 5 n 18 p 633-635: Underpinning elevated railroads; difficult task of supporting numerous elevated columns on Queens Plaza section handled by novel methods; addition of steel trusses to elevated railroads bents permits structure to be carried on two columns instead of four; permanent pipe-pile foundations; temporary pipe-line underpinning; pipe-pile towers for temporary support of columns later to be carried on subway roof.
Mar 31 n 13 p 471-473: Uniform system in handling contract documents developed in 30 years of experience in subway construction; contract sections; contract documents; preparation; unit-price contracts; general contract provisions; comparison of stresses allowed by New York Building Code and those used in subway design by Board of Transportation; specifications. Apr 14 n 15 p 546-549: Underpinning of B.M.T. Centre St. loop at Delancey St. to permit passage of new Houston-Essex St. line underneath; pipe piles aggregating 5 mi were jacked down in order to support existing structure and to serve as foundations for new line; runner beams placed below B.M.T. invert; transverse beams placed later as part of new subway roof steel; drifting for excavation of gallery beneath subway invert. May 5 n 18 p 633-635: Underpinning elevated railroads; difficult task of supporting numerous elevated columns on Queens Plaza section handled by novel methods; addition of steel trusses to elevated railroads bents permits structure to be carried on two columns instead of four; permanent pipe-pile foundations; temporary pipe-line underpinning; pipe-pile towers for temporary support of columns later to be carried on subway roof.
New York subway construction
Eng News-Rec
Griffin, J.H. (Autor:in)
Engineering News-Record ; 108
1932
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
New York electric subway construction methods
Engineering Index Backfile | 1930
|Subway Tunnel Construction in New York City
ASCE | 2021
|Subway tunnel construction in New York city
Engineering Index Backfile | 1964
|Tunnel construction, Sixth Avenue Subway, New York, N.Y
Engineering Index Backfile | 1941
|Tunnel construction, sixth avenue subway, New York, N.Y.
Engineering Index Backfile | 1942
|