Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of Houston and essex street subway
Subway job which involved wrecking of 250 buildings inhabitated by some 10,000 people, excavation of 800,000 cu yd of sandy soil, placing of 160,000 cu yd of concrete, driving of 30,000 lin ft of steel piles, etc.
Construction of Houston and essex street subway
Subway job which involved wrecking of 250 buildings inhabitated by some 10,000 people, excavation of 800,000 cu yd of sandy soil, placing of 160,000 cu yd of concrete, driving of 30,000 lin ft of steel piles, etc.
Construction of Houston and essex street subway
Gen Contractors Assn -- Bul
1932
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction of yonge street subway
Engineering Index Backfile | 1929
|Slice method of subway construction, boylston street subway, Boston, Mass
Engineering Index Backfile | 1915
Solving construction problems in Canal street subway
Engineering Index Backfile | 1919
|Engineering Index Backfile | 1908
Engineering Index Backfile | 1951